Project solves new sewage of Lužec nad Cidlinou and its connection to existing swage system with central wastewater treatment plant. Taking into consideration existing terrain, the sewage needs to be executed in gravitational system. App. 80 buildings will be connected to new sewage that is dimensioned for app. 240 inhabitants. The construction consists of sewage conduit PVC KG DN 250 mm, sewage connections PVC DN 150 and 200 mm, relocation of rain sewage PVC KG DN 500 mm and extension of discharge line PE DN 80 mm.
What did we build?
Sewage Lužec nad Cidlinou
Investor:
Rudník
Location:
Realization:
11/2017 - 12/2018