The most important renovation was the replacement of the existing ceramic pool cladding with a stainless-steel lining. In addition, the pool filter technology was updated to comply with modern requirements.
What did we build?
Reconstruction of the Trutnov Outdoor Swimming Pool
Investor:
Město Trutnov
Location:
Realization:
07/2019 - 06/2020