What did we build?

Group water supply Hořicko, group water supply Kopidlnsko

Investor: VODOHOSPODÁŘSKÁ A OBCHODNÍ SPOLEČNOST, A.S.
Location:
Realization: 04/2020 - 09/2022

Project characteristics

New construction of an engineering network – the Staňova Lhota – Rakov water supply, Batín with the construction of a new storage water tower Chakan. The group water supply will supply drinking water to connected localities and new Chakan water supply will serve as a water supply for municipalities in case of failure of other water reservoirs. The total length of the water pipes is 5 805 metres. The new water tower will be equipped with a solar power plant that will generate electricity for local use.