Complex of film studios located in a former airplane factory Letov in Prague 9. The complex consists of three studios, offices, costume studios and catering on 30.000 sqm. To the current complex will be added two other studios that can be connected into one. The reason for the construction of new studio is constant popularity of Czech film studios among foreign filmmakers and the support of the Czech Republic. The new studios shall attract more foreign crews for film shooting in the Czech Republic.
The construction is designed as a single space skeleton with joint two-storey office building. The building is divided into two identical parts. Every part can offer an independent space for film production. Both parts shall one half of administrative premises. BAK shall finish the works by the end of April 2018.