The subject of the contract is the construction of a sewage system, a sewage treatment plant and the reconstruction of part of the existing water lines, which are designed in the city of Mirotice. The sewer design results from the configuration of the surrounding terrain, the nature of the residential development and the requirement for gravitational de-canalization. Due to unsuitable terrain and inclination conditions, the waste water will be fed to six pumping stations, which will pump the waste water to higher sections of the gravity sewer. The Water treatment plant is designed as a two-line activation, situated in a brick building. The reconstruction of the water lines concerns existing, technically unsatisfactory pipelines. These are mainly cast-iron lines, which are in operation since mid-20th century.
What did we build?
Sewerage, water treatment plant and water supply Mirotice
Investor:
MĚSTO MIROTICE
Location:
Realization:
04/2019 - 03/2022